PM info has been enhanced in assets from release R2023e (November 2023). For instance, "PM Count" is surfaced in asset lists. It shows the number of PMs associated with an asset. A planner can use the PM count to determine if PMs have been set up for critical assets.
Clicking an asset row to drill down to the details of PMs for an asset in the "PM" tab including PMs, PM inspection, and PM round stops.