Troubleshooting Work Order Generation from PMs

Preventive work orders are generated from PMs automatically by Calem. There are cases that PMs are not generating work orders when "Next due" of PMs is passed (screenshot below). This blog walks through steps to troubleshoot these cases.

1. Status of PM and PM Plan

The status of both a PM and its PM Plan must be active for a PM to be selected for generation processing. 

2. Status of Asset

A PM is not eligible for work order generation if a PM is for an asset and the asset status is one of the following:

3. Invalid Time-Based Schedules

A PM is not eligible for work order generation if its PM Plan is by a time-based schedule, and the schedule is invalid.

4. Invalid Meter-Based Schedules

A PM is not eligible for work order generation if its PM Plan is by meter-based schedules, and meter schedules are invalid.

5. Other Cases

There are other cases that PMs are prevented from generating work orders including the following. 


If you run into a case that cannot be resolved by the steps here just reach out to your Calem Team for assistance.